4. PS (Parallel Seismic) & PT (Pile Test)

  • Detect pile damage or any other shortcoming early on.
  • Find out the correct pile type that can endure strains in challenging conditions.
  • Cut down pile length with right end-of-driving requirements.
  • Avoid pile damage from excess driving.